MASTER PLAN OVERVIEW
Columbia Regional Airport is an integral part of the transportation network and economic base for the City of Columbia and the entire mid-Missouri region. As such, it is essential to continually monitor the growth and to plan for the future of the Airport. The Airport Master Plan develops a plan to support the aviation growth of the Airport over the next 20 years.
The major tasks accomplished in the Master Plan update include:
1. Study Design
2. Public Involvement Program
3. Issues and Existing Conditions
4. Environmental Considerations
5. Aviation Demand Forecasts
6. Facility Requirements
7. Identification and Evaluation of Alternatives
8. Airport Layout Plans
9. Facilities Implementation Plan
10. Financial Feasibility Analysis
Airport Master Plan:
- Front Cover
- Executive Summary
- Preamble Page
- Table of Contents
- Chapter 1
- Chapter 2
- Chapter 3
- Chapter 4
- Chapter 5
- Page 1- Cover
- Page 2- Data Sheet
- Page 3- Existing ALP
- Page 4- Future ALP
- Page 5- Aerial Photo
- Page 6- Terminal Area Plan
- Page 7- Core Terminal Area Plan
- Page 8- Ultimate Runway 2 Approach
- Page 9- Ultimate Runway 20 Approach
- Page 10- Future Runway 13 Approach
- Page 11- Future Runway 31 Approach
- Page 12A- Far Part 77 Airspace Surfaces
- Page 12B- Far Part 77 Airspace Surfaces
- Page 13- Land Use Plan
- Page 14- Property Map
- Chapter 6
- Chapter 7
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- Appendix F
- Appendix G
- Appendix H
- Appendix I
- Appendix J
- Appendix K
- Back Cover
Other Reports:
Terminal Improvements- Conceptual Designs February 2011
Files are large and may be slow to download